How V mesh fencing is installed
V mesh goes up post by post. The line is set out, each post is set in post mix at the length its panel needs, and the panels are clamped on with security bolts. On a slope the panels are stepped, and on concrete or tarmac the posts stand on bolted shoes. Stock panels and posts can arrive in about 5 days.
The order of the work, from the line and the posts to the panels, slopes, hard ground and gates.
Free and no obligation. Your request goes to one fencing contractor in your county, not a list.
- about 5 daysfor stock panels and posts
- 10 minutesfor one rapid post mix to set
- 2–5clamps a joint
- 2–3 weeksfor mesh gates
Before anything is dug
- Planning. Over 1.2 m new, or over 2 m at all, settle it with the council first.
- The line. Its length, the corners, the ends and where each gate goes.
- What is underground. Pipes and cables along the line, before a hole is dug.
- The order. Panels, posts, clamps, caps, post mix and gates, with delivery booked.
Price your mesh fence
Three taps and the kit price shows as you go. Your name and number come last, and only if you want a contractor to price the fitting.
V mesh, 1.8 m high, 25 to 50 m: €625 to €2,000.
How the price is worked out
The figure is what Irish sellers charge for the panels, posts and clamps a metre, with VAT, times the length you pick. Where sellers differ you see the lowest and the highest. 358 mesh and ball-stop fences are priced to the site. Fitting is not in the figure: a contractor prices it after walking the line. Use it to plan with. It isn't a quote.
Setting the posts
Posts go in at the centres the panels need: 2.5 m, or about 3.0 m for wider panels. Each post is 0.5 to 0.7 m longer than its panel. Stand it in the hole half filled with water, pour the rapid mix round it, then level it and hold it for about five minutes while it sets.
Line and level matter most at this stage: a post out of line shows along the whole run.
Fixing the panels
Each panel is clamped to the posts either side: 2 clamps a joint on a 1.23 m panel, up to 5 on a 2.43 m one. Single clamps go on the end posts and corner clamps at the corners. The bolts are tamper-proof, turned with their own key. For a flat top, V mesh panels go on upside down.
Slopes
On a slope the panels are stepped, each set to the ground under it, and the clamps let one panel sit higher than the next on the same post. The steeper the ground, the bigger each step.
Hard ground
On concrete or tarmac, each post stands on a shoe or base plate bolted to the surface, €15 to €30, so nothing is broken out.
Gates
Mesh gates come with their own posts, set at the height of the panels either side. They take 2 to 3 weeks to arrive, so order them with the panels, not after.
Other mesh to look at
Questions before you order
How do you install V mesh fencing?
V mesh goes up post by post. The line is set out, each post is set in post mix at the length its panel needs, and the panels are clamped on with security bolts. On a slope the panels are stepped, and on concrete or tarmac the posts stand on bolted shoes. Stock panels and posts can arrive in about 5 days.
How deep do V mesh posts go?
A dig-in post is 0.5 to 0.7 m longer than its panel, and most of that is set in the ground.
Can V mesh be installed on concrete?
Yes. Each post stands on a bolted shoe or base plate.
Can V mesh follow a slope?
Yes. The panels are stepped, each one set to the ground under it.
How long does post mix take?
One rapid mix reaches its final set in about 10 minutes. Hold the post level for about five.
Everything on this site
Mesh and gates
For your site
See the kit price before anyone rings
Pick the mesh, the height and the length. When you want a fitted price, it goes to a single fencing contractor in your county.